Toilet renovation: where to start

The bathroom is an area with special conditions: high humidity, temperature differences. That’s why making fixes in the restroom, you should clearly plan the entire operating process, to consider the sequence of measures to be performed. Within this report, you will find out where to start the fix in the bathroom and what sorts of work ought to be carried out with your hands. Step-by-step instructions for toilet repair

Stage 1: Establishing a strategy and choosing a layout solution vsyakuhnya.ru.

Repair in the bathroom can be of 2 types:

  • Unplanned, spontaneous, originating from the can of unforeseen circumstances. As an example, in case of an pipe burst, flooding by neighbors.
  • Planned, that is either cosmetic or capital. It requires preparation, serious monetary investment and time.

Begin repairs at the bathroom is to determine the plan, inside. Think through to the last detail, what will be the space, select a color. Pastel colours are conventional, as well as a mixture of blue and blue, black or peach with beige.

Begin repairs at the toilet is to ascertain the design, interior design. Think in detail, what will be the space, choose a colour. Pastel colors are deemed traditional, in addition to a combination of colors.

The next point is the choice of facing material. As a rule, finishing at the bathroom is performed with tile, porcelain tiles, mosaic, vinyl panels. Examine the plumbing, if it ought to be replaced. If needed, select an appropriate choice. Proceed to the measuring function: step all sides, calculate the area of the area. Based on these information, we mark the location of the plumbing fittings.

Step 2: the selection of sanitary fittings and substance for finishing.

It is crucial to recognize that the purchase price of sanitary ware simplifies the planning stage, and not vice versa. This means that first we develop a design project, create a plan, and then go to the shop. Another point – you need to specify the size of your favourite plumbing fixtures and inspect the plan, whether it fits.

It is crucial to realize that the cost of plumbing fittings is preceded by a preparation stage, rather than vice versa. This usually means that first we develop a new design project, create a plan, then go to the shop. Another one

As for stuff for completing, it’s better to get them immediately for the whole repair cycle, and that then you will not be diverted if something was missing. Do not forget about preparing the necessary tools.

Measure 3: dismantling plumbing and tiling.

Once all the preliminary work is completed, move on to the Start of the work process:

  • Remove the sink and bathtub from the area, even though they won’t be replaced with fresh ones. This manner, you can keep them intact and clean.
  • Eliminate the tile, cleaning after it all of surfaces: walls, ceiling, floor.
  • Remove paint from the walls, even if they had been previously painted, because the glue solution or a fresh layer of paint won’t adhere to surface.

Step 4: replacement of communications: pipes, electrical wiring.

Very often in an older house, you ought to carefully inspect and replace not only the pipes that are in the bathroom itself, but also the principal riser, and sometimes the interfloor plumbing. Why is it worth doing so? Old pipes at any time may give a leak, then the new fix will be emptied, it will call for extra investment to eliminate defects.

Posted in renovation.